Our construction coverage continues with "Flooring Fix," a case study on how two flooring systems were able to save both time and money in two different applications.
Finally, an article from Venture Tape explains how a pressure-sensitive jacketing system made installation of floor-to-ceiling ductwork in a 200,000-square-foot manufacturing plant faster and safer than traditional methods.